Check current WRA requirements for your borehole and intended water use with Kenya’s Water Resources Authority. Equipment selection and water-use permission are separate project responsibilities. Confirm current requirements for your actual source and use with the Water Resources Authority.
WRA requirements: use the official process
WRA publishes the water-use permitting process, including the submission of completion and borehole records and water-quality analysis where applicable. The required category, fees and conditions must be checked against the actual project.
WRA: water-use permitting →
WRA: groundwater assessment and monitoring →
Keep records with the installation brief
Provide relevant source and permit records when scoping pump installation. A pump purchase or installation quotation does not itself establish permission to abstract water. If your intended use or operating rate changes, check the applicable conditions with WRA.
Solar and electrical installation
Check current professional licensing requirements and use appropriately qualified personnel. EPRA publishes renewable-energy licensing resources; we do not assert an unverified licence or contractor registration.
Prepare the site information for the right enquiry
Keep the owner’s source records together with the pumping and intended-use brief. Identify the site, the water source and how the water will be used. When contacting the authority, describe the actual circumstances rather than assuming that a different borehole’s documentation or category applies to your project. Use the official resources above to check the current process and the office responsible for your enquiry.
For equipment selection, separately record the tested yield, operating water level, required daily volume, tank elevation and delivery route. These inputs help define a pumping duty; they do not replace an authority decision about water use. If existing records or conditions are unclear, identify that gap before agreeing an operating rate or equipment purchase.
WRA requirements and the separate equipment proposal
Ask your installer to state the equipment and work covered by the quotation. Our installation process explains the selection and handover stages, and our pumping assessment service sets out the technical information to discuss. For WRA requirements, fees, category or permit status, obtain current confirmation directly from the authority for your actual source and intended use.