From source to storage · Enquiries across KenyaLet’s talk water: +254 743 731151 ↗

Complete borehole equipping in Kenya

Borehole equipping

Borehole equipping brings your completed borehole, selected equipment and storage connection together as a working water system. We bring together the pump, motor, power arrangement, pipes, cable, controls, headworks and installation in one itemised borehole-equipping quotation.

Approximate cost in Kenya

Borehole equipping costs and included work

KSh 180,000–600,000 — Electric equipping of an already drilled borehole: selected pump and motor, controls, pipes, cable, headworks and installation.

KSh 300,000–1,200,000+ — Solar equipping with the pumping equipment, solar array, drive, mounting, protection and installation.

Allow separately: Drilling, new tanks and towers, treatment, major civil works and long distribution pipelines are separate.

Planning estimates reviewed 10 October 2026, not a fixed quotation or confirmed call-out rate. Equipment, depth of installation, access and location change the total; some projects fall outside these ranges. Confirm VAT, transport and all inclusions in your written quotation.

Get a quotation for your borehole →

Drilling creates the source; equipping gets the water to your tank. The complete cost depends on the test results, pumping depth, delivery route and whether you choose electric or solar power. Comparing the same list of equipment and work makes the difference between a useful quotation and an incomplete budget.

Solar borehole pumping system with a panel array and elevated water tank — borehole equipping
Bring the borehole, equipment and storage togetherEquipping covers the agreed pump, motor, pipework, cable, protection and connections. The power source and final scope are selected for the actual borehole.AI-generated installation illustration; not a completed company project.

When to book borehole equipping

Choose complete equipping when you want the main pumping equipment and installation planned together. Send the drilling completion report, pumping-test report, location and daily water requirement. Explain what power, storage and site works are already available.

What borehole equipping includes

Your quotation shows the selected models, material quantities, labour and testing, plus the boundary of the installation. After installation, the system is commissioned and the operator receives the equipment details, normal operating guidance and service contact.

Know who is doing each part of the job

A borehole project can involve the driller, pump installer, electrician, plumber and tank or civil-work contractor. Identify who provides the incoming power, trench, tank support and final connections. If you supply some equipment yourself, have the installer check it early. Clear responsibilities prevent delays on installation day and make the quotation easier to compare with the actual work completed.

If another specialist handles part of the project, share the agreed design inputs and connection requirements before ordering. The same principle applies when the owner buys equipment separately: the installer needs the actual model information and an opportunity to check the proposed match. Agree changes in quantity, route or duty in writing before changing the work. Different companies can handle parts of a coordinated scope. Each company still needs clear connection requirements and responsibilities. We help turn those connection requirements into a clear project brief for quotations and review.

Use your borehole report to choose the right pump

Keep the drilling completion report and pumping-test report together. They tell the pump supplier more than the drilled depth on its own. The water level while pumping, tested discharge and recommended operating conditions help establish what the source can support. For an older borehole in use, share recent tank-filling times and any change in output as well. If the driller holds the report, request a copy before ordering equipment.

We use the records to frame the questions that need answering, rather than promise a result from a depth figure alone. Tell us the date of the latest pumping test, whether demand has changed and whether recent operation differs from the original report. A borehole supplying one household may later serve rental units, livestock or irrigation. That change deserves a fresh demand and duty discussion, even if the old pump still starts. Keep the accepted design basis with the equipment quotation so future maintenance starts from the same facts.

Work out how much water you need each day

Start with litres per day and who will use the water. A family home, a block of rental units and a dairy farm have different demand patterns. For irrigation, include the crop, area, watering method and schedule. For apartments, include the number of occupied units and shared uses. Tell us how much storage is available and when the tanks need to be full; that makes a more useful buying brief than simply asking for the biggest pump.

Give us the current tank capacity, expected future users and the hours during which pumping is practical. For a school, explain term-time demand; for a farm, describe the crop and watering schedule; for rental property, identify shared and private storage. We can then discuss a scope that connects abstraction, pumping and storage. Buying the largest available motor is not a substitute for this brief. The practical target is an agreed water-delivery duty that the source and selected equipment can support, with operating duties the owner can understand.

Compare pump performance, not horsepower alone

A 2 HP pump is not automatically a substitute for another 2 HP pump. The number of stages and hydraulic design affect the flow each can deliver at your pumping head. Ask for the full model code and the matching performance curve. Compare both options at the same required flow and head. This helps you avoid paying for a pump that looks powerful on paper but cannot fill the tank as intended.

For listed pump ends, remember that the hydraulic assembly is not necessarily a complete pump-and-motor package. Confirm the motor, coupling, control arrangement and included accessories separately. For a replacement, an apparently similar model number is not enough to prove compatibility with the retained parts. We help organise the product information into a proposal that names the exact option and its supporting equipment. Where the source documentation does not establish a numerical specification, the quotation should obtain it instead of presenting an estimate as a manufacturer guarantee.

Know whether the price includes the motor

A pump end is the section that moves the water; the motor drives it. Some listings are for the pump end only, while others are complete assemblies. Check the package before comparing prices. The selected motor must match the hydraulic end, power supply and controls, including phase and voltage. For a replacement, send both labels so the supplier can check the retained parts alongside the new component.

If you are replacing only one part of an existing assembly, send clear photographs of both the pump and motor labels. Include the reason for the replacement and any diagnostic findings. Retaining a sound component can be sensible when the match is verified, but installing a new motor against an unresolved hydraulic fault can repeat the original problem. The written quotation should distinguish the motor, pump end, complete assembly and starter so you can see what the price actually buys and which existing parts will remain in service.

Confirm mains electricity, generator or solar power

Tell us whether the property has single-phase or three-phase electricity, a generator, solar or a combination. Include the motor label and the distance from the supply point to the control panel. If the pump trips after a power interruption, mention that history. A suitable motor and correctly planned connection are essential; the quotation should show who supplies and tests the incoming electrical connection as well as the borehole equipment.

Provide photographs of the existing distribution board, motor label and controller where it is safe to obtain them without opening live equipment. Electrical measurements and alterations belong to appropriately qualified personnel. Agree who is responsible for the supply-to-panel connection, isolation, earthing, cable route and testing. A pump quotation that stops at the motor leaves important connections unresolved unless it names who will complete that work. We bring these questions into your quotation so the system proposal accounts for the route from available power to controlled water delivery.

Pump during the day and store water for later

For many homes and farms, solar pumping makes the most sense when water is pumped into a tank during daylight and used as needed. Start with the litres required each day, source capacity and tank storage. The pump, controller and panels must be selected together for the actual head. More solar panels cannot create water the borehole does not yield, and a high panel-wattage figure alone does not establish your daily water output.

Describe seasonal demand, available array space, shading, security and whether water is needed outside solar operating hours. Storage can make a major difference to how the water supply is managed. Any proposed alternative power integration needs a documented compatible arrangement; it should not be improvised through unsupported connections. We help compare the complete equipment and work, including mounting, cable, isolation and hydraulic requirements. The objective is an understandable daily-water plan, with the selected hardware and the owner’s operating expectations recorded together.

Choose drop pipes for pressure and suspended load

The rising main carries water up the borehole and forms part of the suspended installation. Its material, pressure rating, joints and load capability must suit the pump setting and duty. A pipe of the right diameter can still be unsuitable for the job. Compare the specified drop-pipe system with the cheaper-looking alternative before ordering. Surface HDPE delivery pipe has a different role. List it separately in the bill of quantities.

Our pipe catalogue identifies nominal sizes and the pressure designations supplied on the list. Prices are shown per pipe length, with the actual physical length and coupling details confirmed in the quotation. Ask the proposal to state the total measured quantity and any separately priced fittings or adaptors. For retained pipework, inspection findings should determine what can be reused. The rising main and the surface delivery line may have different requirements. Itemise their materials, quantities and installation work separately. This makes both the purchase and any future maintenance easier to understand.

Buy the right cable size and measured length

Submersible cable runs between the motor and the control arrangement and must suit the wet environment and electrical duty. The conductor size depends on the motor, supply and full route length. Saving on an undersized cable can cause problems that cost much more to correct after lowering. Our cable prices are per metre; ask for the cable size, quantity, routing allowance and jointing materials on the same quotation.

Cable prices in this catalogue are per metre. Agree the measured length, allowance for routing and terminations, joint positions and the exact conductor and insulation specification before ordering. Before retaining an existing cable, have its condition and suitability assessed. Looking at the accessible end alone cannot establish its condition. A quotation should identify terminations and approved jointing materials alongside the main cable quantity. Include these details in the materials schedule so you can budget for necessary electrical materials alongside the equipment price.

Use a proper waterproof cable-jointing kit

A cable joint inside the borehole needs the correct waterproof system for the cable and application. Ordinary insulating tape is not a replacement for a suitable submerged joint. Our shop includes Cellpack jointing-kit options; the installer must confirm the right kit and follow its instructions. Include the kit and electrical testing in the installation price so a small omitted item does not become a hidden weakness in the system.

Do not transfer specifications from a similarly named product without verifying that it is the same kit. Ask the installer to identify the jointing material, preparation method and relevant testing in the scope. Insulating tape may be useful as a general accessory, but it is not a substitute for a properly specified submerged joint system. Good purchasing records identify the kit and show where the joint sits in the installed cable. That record can save time when later electrical testing needs to distinguish a cable fault from a motor or controller issue.

Make sure the pump starts and stops correctly

The control panel should suit the motor and the way you want the water supply to operate. Explain whether the pump fills a tank, follows a level signal or works to a different arrangement. Ask which protective functions the controller provides and which need separate sensors. A full tank should have the agreed stop response, and a fault should be recognisable to the operator. These behaviours need testing during commissioning, not just a demonstration that the motor starts.

Ask the proposal to distinguish the panel, sensors, cable and installation work. Confirm how a normal stop differs from a fault indication, who may change settings and what the operator should do when the system trips. During commissioning, the installer should check and record the relevant control behaviour against the agreed scope. A system that only works when an operator repeatedly overrides a warning needs diagnosis. Clear controls and a practical handover give the owner useful information without encouraging unqualified adjustments to electrical equipment or undocumented changes to protection settings.

Budget for electrical protection and earthing

The electrical design should include suitable isolation, protective devices and earthing for the motor, controller and power source. With solar, the PV disconnect must suit the actual DC voltage and current. A lightning-arrestor product on its own is not a complete protection system. Ask for the proposed devices and electrical work to be listed, particularly where the installation is exposed or the property has a history of power-related faults.

Have appropriately qualified personnel define isolation, protective devices, earthing and the verification work. The quotation should identify what is included and what belongs to an existing upstream supply installation. For exposed or remote sites, discuss access for inspection and the practical route for reporting a fault. Retain the protection schedule with the motor and controller records. This is valuable when equipment is changed later: a replacement can alter the electrical requirements, so the old protection arrangement should be reviewed instead of simply reused because the previous pump used the same nominal kilowatt rating.

Keep surface connections secure and serviceable

The borehole headworks are where the rising main meets the delivery pipe, valves, meter and supporting arrangement. Plan accessible connections so a technician can inspect the system or lift the pump later. Tell us about leaks, damaged covers or cramped space. Select non-return valves, flange sets and water meters for the pipe, pressure and connections. Nominal diameter alone does not establish suitability.

Our catalogue includes flap non-return valves, water meters and flange sets in the listed sizes. Each needs its pressure, material and connection details confirmed for the actual supply. Matching nominal diameter alone does not prove that flange drilling or pressure classes are compatible. A useful quotation identifies included gaskets, bolts, adaptors and any separately priced civil or fabrication work. Keep a simple layout in the handover file so an operator can identify the normal delivery path and a future technician can understand how the source, meter, valves and downstream system connect.

Size the tank around actual water use

Storage helps separate the rate at which a borehole supplies water from the rate at which people use it. An apartment block may draw heavily in the morning; a solar system produces water during useful daylight hours. Share the existing tank capacity and inlet height, and explain when shortages occur. The answer may be storage, controls or distribution improvements rather than a larger source pump.

Send the tank capacity, inlet elevation, current level-control arrangement and any planned expansion. Supporting structures, foundations and building alterations need their own appropriate assessment. Check whether the pump connection price includes any of this work. Agree the boundary between borehole pumping, storage and downstream distribution. For multiple tanks or user groups, define who operates valves, monitors levels and reports faults. The resulting scope should make the whole water route understandable, including any components or works that are being provided by another contractor.

Test borehole water before choosing treatment

Clear water is not proof that borehole water is suitable for drinking. Share the laboratory report and explain whether the supply is for domestic use, livestock, irrigation or a process. Water quality can also affect equipment materials and treatment selection. Do not assume all boreholes in a county have the same chemistry. Treatment equipment needs to match the actual analysis and required flow; a small household reverse-osmosis unit is not a universal whole-property solution.

For a new project, include available laboratory results with the borehole records. For an existing system, tell us about changes in colour, sediment, odour or operating behaviour, while recognising that these observations do not replace analysis. If you need treatment, choose its specification using the feed-water condition and required output. A seven-stage reverse-osmosis listing is not a universal treatment design for every borehole. Agree any pretreatment, maintenance consumables, reject-water handling and quality verification separately. Document these decisions clearly. A pump installation alone does not establish a drinking-water guarantee.

Compare borehole equipping quotations on the same scope

Ask for an itemised quotation showing the exact pump, motor, control panel, pipe and cable quantities, fittings, labour and commissioning. With solar, include panels, inverter, mounting and protection. Then check transport, VAT, trenching and electrical connections. A lower total can simply mean that important items are missing. Comparing the same requirements makes it easier to choose value for money and agree the full bill before work starts.

Confirm tax treatment, delivery or collection, payment stages, availability and the written warranty route before accepting the order. Compare proposals using the same duty and included work. One quotation may cover a pump end only while another includes a motor, controls, cable and commissioning. Another may exclude civil work or the supply-to-panel connection. Request those differences in plain language. Your approved scope should name the supplied equipment, the installer’s work and your own responsibilities. It should also explain how you approve changes if the assessment reveals additional work.

What changes the cost of borehole equipping?

The main price drivers are the selected pump and motor, installed depth, pipe and cable quantities, power arrangement and access for the work. A longer cable run or a higher tank can change both the materials and equipment selection. For solar, panel capacity, mounting and the pumping inverter also affect the total. Tell us whether the price you need is supply only, installation labour or a complete working system.

Use the approximate range near the start of this page as an initial budget. The written quotation confirms your actual quantities and work. Compare cable prices per metre, drop pipe prices per supplied length, and accessory prices per piece or set, using the units stated in the shop. Confirm the physical pipe length before calculating the number required. Ask whether the price includes VAT, transport, lifting equipment, trenching and commissioning. Keep a separate allowance for tanks, towers, treatment or a new power connection unless the quotation lists them. Larger or difficult installations may cost more than the indicative range; the equipment and measured work should explain why.

Plan borehole equipping for your county and site

A location pin, contact person and access details help us prepare a realistic delivery or installation quotation. Tell us about rough access roads, narrow gates, restricted working hours and space to unload pipes or lifting equipment. For an occupied apartment block or school, agree the water-interruption window. These practical details affect travel, equipment and time on site, so share them before booking the visit.

Our contact base is Kamulu, Nairobi, and enquiries are welcome from all forty-seven Kenyan counties. County planning pages help collect the right information; they do not represent a separate branch or a guaranteed attendance time. Confirm travel, delivery and scheduling for your actual project before booking. The aim is to arrive with an agreed scope and the correct equipment information, while acknowledging any assessment still needed on site. Clear access details also help distinguish a price for collection from a delivered price and from a complete installation commitment.

Borehole equipping: check delivery before sign-off

Commissioning checks the installed system against the agreed job. Ask for measured delivery at the stated point, relevant electrical checks and a demonstration of the controls. Water at the borehole outlet is different from water reaching a distant tank. Record the model, pump setting, cable and pipe details and test results. These readings become the reference for future service if tank-filling time or output changes.

Ask the installer to explain the test results and any limitations at handover. If measurements differ from the expected performance, ask the installer to investigate the findings and explain the next step. A running pump alone does not confirm the agreed delivery. The acceptance location also matters: delivery at the headworks is different from delivery at a distant tank inlet. Keep the commissioning record with the source documents and quotation. It becomes a useful baseline for later maintenance, helps identify changes in source or delivery conditions and makes future equipment decisions easier to check.

Borehole equipping records and operating instructions

Before the team leaves, make sure the person who will run the system understands the normal start, stop and fault indications. Keep the invoice, installed models, serial numbers, test results and written warranty terms together. For shared property, give the caretaker access to the service contact and agreed operating instructions. A clear handover saves time during maintenance and helps you distinguish existing equipment from parts supplied during the new work.

Keep the invoice and written warranty terms with the model and serial numbers. Ask the supplier to confirm the warranty scope, provider, duration and exclusions for the actual equipment. A website brand mention does not establish warranty cover. If the project retains old equipment, mark it clearly in the handover schedule. If the installer recommends further assessment or follow-up, record the reason and who will handle it. This approach gives the owner an installation file that remains useful after the technicians leave and supports a more direct conversation when another service visit becomes necessary.

Keep the borehole and water-use records in order

Keep the borehole completion report, pumping-test information and applicable water-use authorisation with the project documents. Kenya’s Water Resources Authority provides the official guidance on abstraction requirements. Buying a larger pump does not itself allow a higher abstraction rate. For electrical and solar work, confirm the applicable professional requirements using EPRA resources and appoint appropriately qualified people for the actual installation.

For solar and electrical work, use appropriately qualified personnel and verify the applicable professional requirements through the official Energy and Petroleum Regulatory Authority resources. The quotation should assign responsibility for permits, electrical interfaces and specialist assessments where needed. Use the official resources below to obtain current guidance directly. Manufacturer instructions and site-specific assessment remain necessary alongside those public requirements; neither a catalogue price nor a service page is a substitute for an approved project design.

Arrange drilling and related engineering where needed

If the borehole has not been drilled or the project also needs wider engineering work, tell us at the first enquiry. Our sister companies are Borehole Drillers Kenya and Hamiki Engineering. Their involvement should have a clear description of the work and a quotation. If you already have a driller or another contractor, we can use their source records and agreed connection requirements to plan the pumping installation.

Tell us about any drilling, source assessment, civil, structural or wider engineering requirements when you send the brief. We can identify which parts belong in this proposal and which need a separate specialist discussion. If you already have another contractor, share the relevant records and interface requirements so the pump selection is coordinated with that work. The useful outcome is a project file with clear responsibilities and compatible design inputs.

Questions about borehole equipping

How much should I budget for this service?

As an initial guide, allow KSh 180,000–600,000 for electric equipping of an already drilled borehole: selected pump and motor, controls, pipes, cable, headworks and installation. A second allowance is KSh 300,000–1,200,000+ for solar equipping with the pumping equipment, solar array, drive, mounting, protection and installation. These are planning figures, not a fixed quotation. Confirm VAT, travel, materials and all included work for your site.

What do I need to send for a quotation?

Send your county, nearest town, location pin, daily water requirement and available borehole or equipment records. For an existing system, include clear pump, motor and controller labels and a description of the fault or work required. Tell us what information is missing.

Can you supply the products and install them?

You can request equipment supply only or a quotation including the agreed installation work. The quotation lists the exact models, quantities, labour and testing so you can see what the total covers. We check compatibility before selecting equipment.

Can I get an estimate before a site visit?

Yes. The range at the top of this page is a starting budget. Share the available records and photos for an initial review. If your project needs measurements or diagnosis, agree the assessment charge and the next step before booking.

Do you handle projects outside Nairobi?

Send your enquiry from any of Kenya’s 47 counties. Our contact base is Kamulu, Nairobi. We confirm travel, delivery and the practical installation or service arrangements for your location before booking.

What about stock, warranty and payment?

Confirm the selected equipment, availability, delivery time, written warranty terms and payment stages in your quotation. Keep the invoice, model and serial numbers and handover record together for later support.

Manufacturer and official resources

Use these resources for current requirements and equipment guidance. The documentation for the exact supplied model and a site-specific assessment remain the basis for the work.

Our sister companies

For related work outside the agreed pumping scope, contact Borehole Drillers Kenya or Hamiki Engineering. Confirm their scope and quotation separately.

Get a quotation for your borehole

Send your location pin, water requirement and available equipment or borehole records. Tell us whether you need supply only, installation, repair or conversion, and we will help identify the next step for your quotation. Call +254 743 731151 or email support@boreholepumpinstallation.com.

Review installation price factors · Find your county · Compare all services