Test pumping and pump sizing
Test pumping and pump sizing establish the measurements and design duty needed before choosing borehole equipment. We review your borehole pumping-test report, water demand, tank height and pipe route to establish the flow and head the equipment must deliver. Additional field assessment is quoted when the records are incomplete.
Approximate cost in Kenya
Test pumping and pump sizing costs
KSh 10,000–30,000 — An allowance for a site assessment, review of available test records and pump-selection calculations.
KSh 50,000–150,000+ — A separately arranged field pumping test, depending on duration, test equipment, discharge arrangements and reporting.
Allow separately: Drilling, rehabilitation, long-distance mobilisation, laboratory analysis and permits are separate. Reviewing a report is not the same as carrying out a new pumping test.
Planning estimates reviewed 10 October 2026, not a fixed quotation or confirmed call-out rate. Equipment, depth of installation, access and location change the total; some projects fall outside these ranges. Confirm VAT, transport and all inclusions in your written quotation.
“My borehole is 200 metres deep” is a useful starting detail, but it is not enough to choose the pump. The pumping water level, sustainable output and height of the tank can change the selection considerably. A proper calculation helps avoid both an undersized purchase and unnecessary motor costs.
When to book test pumping and pump sizing
Request sizing for a new installation, increased demand, a proposed model you want checked or an old system without reliable records. Send the full pumping-test report rather than only the depth or a single yield figure. Tell us which measurements are unavailable.
What test pumping and pump sizing includes
The output is a clear selection basis: required flow, total head, source information, operating plan and a proposed model checked against its curve. Where a new pumping test is necessary, its method, duration and report are agreed separately before the field work.
Use your borehole report to choose the right pump
Keep the drilling completion report and pumping-test report together. They tell the pump supplier more than the drilled depth on its own. The water level while pumping, tested discharge and recommended operating conditions help establish what the source can support. For an older borehole in use, share recent tank-filling times and any change in output as well. If the driller holds the report, request a copy before ordering equipment.
We use the records to frame the questions that need answering, rather than promise a result from a depth figure alone. Tell us the date of the latest pumping test, whether demand has changed and whether recent operation differs from the original report. A borehole supplying one household may later serve rental units, livestock or irrigation. That change deserves a fresh demand and duty discussion, even if the old pump still starts. Keep the accepted design basis with the equipment quotation so future maintenance starts from the same facts.
Work out how much water you need each day
Start with litres per day and who will use the water. A family home, a block of rental units and a dairy farm have different demand patterns. For irrigation, include the crop, area, watering method and schedule. For apartments, include the number of occupied units and shared uses. Tell us how much storage is available and when the tanks need to be full; that makes a more useful buying brief than simply asking for the biggest pump.
Give us the current tank capacity, expected future users and the hours during which pumping is practical. For a school, explain term-time demand; for a farm, describe the crop and watering schedule; for rental property, identify shared and private storage. We can then discuss a scope that connects abstraction, pumping and storage. Buying the largest available motor is not a substitute for this brief. The practical target is an agreed water-delivery duty that the source and selected equipment can support, with operating duties the owner can understand.
Will the pump deliver water to your tank?
The pump must lift water from the pumping water level and deliver it through the pipework to the agreed outlet. A raised tank, uphill plot or long delivery line adds to the duty. That is why two boreholes drilled to the same depth can need different pumps. Share the tank inlet height and route from the borehole. The selection should show the required flow at the total pumping head, rather than unrelated maximum-flow and maximum-head figures.
Send a simple site sketch showing the source, tank, approximate route, changes in elevation and any existing pipe sizes. The agreed assessment can refine these measurements. Ask the supplier to mark the proposed operating point on the curve for the exact pump model. A maximum-head figure and a maximum-flow figure are not a promise that both occur together. Clear duty information also helps compare quotations: two differently priced pumps may be designed for different jobs, while two equal-kilowatt pumps may have very different hydraulic performance.
Compare pump performance, not horsepower alone
A 2 HP pump is not automatically a substitute for another 2 HP pump. The number of stages and hydraulic design affect the flow each can deliver at your pumping head. Ask for the full model code and the matching performance curve. Compare both options at the same required flow and head. This helps you avoid paying for a pump that looks powerful on paper but cannot fill the tank as intended.
For listed pump ends, remember that the hydraulic assembly is not necessarily a complete pump-and-motor package. Confirm the motor, coupling, control arrangement and included accessories separately. For a replacement, an apparently similar model number is not enough to prove compatibility with the retained parts. We help organise the product information into a proposal that names the exact option and its supporting equipment. Where the source documentation does not establish a numerical specification, the quotation should obtain it instead of presenting an estimate as a manufacturer guarantee.
Keep a simple record of tank filling and faults
An operating log does not need to be complicated. Record the usual pumping hours, tank-filling time, controller codes and any visible leaks or unusual noise. Note whether a change followed a power interruption, pipework or an increase in users. The record helps a technician narrow the checks and compare conditions fairly. Keep observations separate from assumptions about the cause so a pump is not replaced simply because the tank is filling slowly.
The operator can keep a straightforward log without opening electrical equipment or changing protection settings. Report unusual noise, visible leaks, repeated faults or changes in water appearance through the agreed support route. The qualified service scope can then identify which measurements or inspections are required. These records are particularly valuable for systems serving several users, where a gradual loss of performance may otherwise go unnoticed until storage runs empty. Keeping the evidence with the installation file makes maintenance discussions more specific and helps distinguish source, equipment and demand changes.
Test borehole water before choosing treatment
Clear water is not proof that borehole water is suitable for drinking. Share the laboratory report and explain whether the supply is for domestic use, livestock, irrigation or a process. Water quality can also affect equipment materials and treatment selection. Do not assume all boreholes in a county have the same chemistry. Treatment equipment needs to match the actual analysis and required flow; a small household reverse-osmosis unit is not a universal whole-property solution.
For a new project, include available laboratory results with the borehole records. For an existing system, tell us about changes in colour, sediment, odour or operating behaviour, while recognising that these observations do not replace analysis. If you need treatment, choose its specification using the feed-water condition and required output. A seven-stage reverse-osmosis listing is not a universal treatment design for every borehole. Agree any pretreatment, maintenance consumables, reject-water handling and quality verification separately. Document these decisions clearly. A pump installation alone does not establish a drinking-water guarantee.
Keep the borehole and water-use records in order
Keep the borehole completion report, pumping-test information and applicable water-use authorisation with the project documents. Kenya’s Water Resources Authority provides the official guidance on abstraction requirements. Buying a larger pump does not itself allow a higher abstraction rate. For electrical and solar work, confirm the applicable professional requirements using EPRA resources and appoint appropriately qualified people for the actual installation.
For solar and electrical work, use appropriately qualified personnel and verify the applicable professional requirements through the official Energy and Petroleum Regulatory Authority resources. The quotation should assign responsibility for permits, electrical interfaces and specialist assessments where needed. Use the official resources below to obtain current guidance directly. Manufacturer instructions and site-specific assessment remain necessary alongside those public requirements; neither a catalogue price nor a service page is a substitute for an approved project design.
Confirm mains electricity, generator or solar power
Tell us whether the property has single-phase or three-phase electricity, a generator, solar or a combination. Include the motor label and the distance from the supply point to the control panel. If the pump trips after a power interruption, mention that history. A suitable motor and correctly planned connection are essential; the quotation should show who supplies and tests the incoming electrical connection as well as the borehole equipment.
Provide photographs of the existing distribution board, motor label and controller where it is safe to obtain them without opening live equipment. Electrical measurements and alterations belong to appropriately qualified personnel. Agree who is responsible for the supply-to-panel connection, isolation, earthing, cable route and testing. A pump quotation that stops at the motor leaves important connections unresolved unless it names who will complete that work. We bring these questions into your quotation so the system proposal accounts for the route from available power to controlled water delivery.
Know whether the price includes the motor
A pump end is the section that moves the water; the motor drives it. Some listings are for the pump end only, while others are complete assemblies. Check the package before comparing prices. The selected motor must match the hydraulic end, power supply and controls, including phase and voltage. For a replacement, send both labels so the supplier can check the retained parts alongside the new component.
If you are replacing only one part of an existing assembly, send clear photographs of both the pump and motor labels. Include the reason for the replacement and any diagnostic findings. Retaining a sound component can be sensible when the match is verified, but installing a new motor against an unresolved hydraulic fault can repeat the original problem. The written quotation should distinguish the motor, pump end, complete assembly and starter so you can see what the price actually buys and which existing parts will remain in service.
Check that the pump will fit and can be lifted later
Confirm the actual clear inside diameter of the borehole casing before buying the submerged assembly. The pump, motor, cable and joints all need room. Share the completion report and any history of obstructions or difficult lifting. At the surface, keep enough access for installation and future retrieval. A permanent structure, parking obstruction or tightly enclosed pump house can turn a straightforward replacement into a more expensive job.
For existing systems, provide the old pump setting, pipe type, cable details and photographs of the headworks. Tell us about previous retrieval problems before new equipment is booked. The scope should identify what is known, what requires inspection and how an unexpected obstruction would be handled. This helps avoid treating a straightforward supply quotation as a commitment to work that has not been assessed. A good installation remains serviceable after handover, so clearance and access should be considered alongside the immediate need to lower the equipment.
Size the tank around actual water use
Storage helps separate the rate at which a borehole supplies water from the rate at which people use it. An apartment block may draw heavily in the morning; a solar system produces water during useful daylight hours. Share the existing tank capacity and inlet height, and explain when shortages occur. The answer may be storage, controls or distribution improvements rather than a larger source pump.
Send the tank capacity, inlet elevation, current level-control arrangement and any planned expansion. Supporting structures, foundations and building alterations need their own appropriate assessment. Check whether the pump connection price includes any of this work. Agree the boundary between borehole pumping, storage and downstream distribution. For multiple tanks or user groups, define who operates valves, monitors levels and reports faults. The resulting scope should make the whole water route understandable, including any components or works that are being provided by another contractor.
Separate tank filling from water pressure at the taps
A borehole pump selected to fill a tank may not be designed to feed every tap, sprinkler or drip line directly. Building pressure and irrigation outlets have their own requirements. Show where water is stored and where it is used. If a booster pump, filtration or irrigation network is needed, include it as a separate design item. This prevents the borehole pump being expected to solve an unplanned downstream problem.
Provide a layout showing the proposed connection point, pipe route, existing valves and the users served. State which sections are part of the requested quotation and which remain outside the scope. Ask for the acceptance measurement to identify the delivery point so a stated flow is meaningful. If distribution conditions will change later, discuss that change before equipment selection. We can help frame the supply and installation responsibilities and the information needed for a coordinated proposal, while structural, treatment or other specialist work is assessed separately where the project requires it.
Plan for the people who depend on the water
For a home, think about daily use and the reserve tank. With rental units, include occupancy, shared facilities and who manages the supply. For a farm, separate livestock, irrigation and household use. A school or community project needs an identified operator and a maintenance budget. These details change the useful pumping schedule and storage requirement; a standard equipment package will not suit every property equally.
Tell us which outcome matters most: first water delivery from an unequipped source, recovery of an interrupted supply, a better power arrangement or a documented replacement. We can then discuss the relevant assessment and equipment options without treating every enquiry as a standard package. Where future expansion is planned, share it before selection so the design assumptions are visible. An expansion allowance should be explained rather than hidden inside an oversized purchase. The practical result is a proposal connected to the users and operating pattern of your property.
Pay for the right first step
Where the old pump is unidentified, reports are missing or a fault has not been diagnosed, the first step may be a paid assessment. Agree its charge and what findings or calculations you will receive. Then use that information to approve the equipment or repair quotation. This is often better value than buying parts that cannot be matched to the installation or paying twice for undocumented investigation.
A staged proposal should explain what will be checked, which findings may require retrieval or specialist input and how further work will be approved. It should also state whether an initial assessment charge is separate from later installation or supply. Clear stages keep the project moving while preserving a reviewable decision at each point. We can discuss equipment options early, but final selection should reflect the evidence available for your site. The approach is especially helpful when a previously working system has several undocumented alterations or when a source is being brought back into use after a long period without reliable operating records.
Allow for expansion with a clear calculation
Tell us about additional rental units, a larger herd, new irrigation blocks or another tank before equipment is selected. Future demand can be checked as a separate scenario. An oversized pump is not automatically a good investment: the source, pipework, controls and power must support the intended duty. A documented expansion plan helps you decide what to buy now and which additions can wait.
Ask the proposal to distinguish the present design duty from a future scenario. Any allowance should state what it covers and which later components or assessments would still be needed. Keep that explanation with the installed equipment records so an eventual upgrade can begin from the original reasoning. If the project changes after installation, revisit the duty and interfaces rather than relying on a general expectation that spare capacity exists. A documented path for expansion is more useful than an unsupported promise that one equipment purchase will meet every possible future requirement.
Know who is doing each part of the job
A borehole project can involve the driller, pump installer, electrician, plumber and tank or civil-work contractor. Identify who provides the incoming power, trench, tank support and final connections. If you supply some equipment yourself, have the installer check it early. Clear responsibilities prevent delays on installation day and make the quotation easier to compare with the actual work completed.
If another specialist handles part of the project, share the agreed design inputs and connection requirements before ordering. The same principle applies when the owner buys equipment separately: the installer needs the actual model information and an opportunity to check the proposed match. Agree changes in quantity, route or duty in writing before changing the work. Different companies can handle parts of a coordinated scope. Each company still needs clear connection requirements and responsibilities. We help turn those connection requirements into a clear project brief for quotations and review.
Compare test pumping and pump sizing quotations on the same scope
Ask for an itemised quotation showing the exact pump, motor, control panel, pipe and cable quantities, fittings, labour and commissioning. With solar, include panels, inverter, mounting and protection. Then check transport, VAT, trenching and electrical connections. A lower total can simply mean that important items are missing. Comparing the same requirements makes it easier to choose value for money and agree the full bill before work starts.
Confirm tax treatment, delivery or collection, payment stages, availability and the written warranty route before accepting the order. Compare proposals using the same duty and included work. One quotation may cover a pump end only while another includes a motor, controls, cable and commissioning. Another may exclude civil work or the supply-to-panel connection. Request those differences in plain language. Your approved scope should name the supplied equipment, the installer’s work and your own responsibilities. It should also explain how you approve changes if the assessment reveals additional work.
What changes the cost of test pumping and pump sizing?
The main price drivers are the selected pump and motor, installed depth, pipe and cable quantities, power arrangement and access for the work. A longer cable run or a higher tank can change both the materials and equipment selection. For solar, panel capacity, mounting and the pumping inverter also affect the total. Tell us whether the price you need is supply only, installation labour or a complete working system.
Use the approximate range near the start of this page as an initial budget. The written quotation confirms your actual quantities and work. Compare cable prices per metre, drop pipe prices per supplied length, and accessory prices per piece or set, using the units stated in the shop. Confirm the physical pipe length before calculating the number required. Ask whether the price includes VAT, transport, lifting equipment, trenching and commissioning. Keep a separate allowance for tanks, towers, treatment or a new power connection unless the quotation lists them. Larger or difficult installations may cost more than the indicative range; the equipment and measured work should explain why.
Test pumping and pump sizing: check delivery before sign-off
Commissioning checks the installed system against the agreed job. Ask for measured delivery at the stated point, relevant electrical checks and a demonstration of the controls. Water at the borehole outlet is different from water reaching a distant tank. Record the model, pump setting, cable and pipe details and test results. These readings become the reference for future service if tank-filling time or output changes.
Ask the installer to explain the test results and any limitations at handover. If measurements differ from the expected performance, ask the installer to investigate the findings and explain the next step. A running pump alone does not confirm the agreed delivery. The acceptance location also matters: delivery at the headworks is different from delivery at a distant tank inlet. Keep the commissioning record with the source documents and quotation. It becomes a useful baseline for later maintenance, helps identify changes in source or delivery conditions and makes future equipment decisions easier to check.
Test pumping and pump sizing records and operating instructions
Before the team leaves, make sure the person who will run the system understands the normal start, stop and fault indications. Keep the invoice, installed models, serial numbers, test results and written warranty terms together. For shared property, give the caretaker access to the service contact and agreed operating instructions. A clear handover saves time during maintenance and helps you distinguish existing equipment from parts supplied during the new work.
Keep the invoice and written warranty terms with the model and serial numbers. Ask the supplier to confirm the warranty scope, provider, duration and exclusions for the actual equipment. A website brand mention does not establish warranty cover. If the project retains old equipment, mark it clearly in the handover schedule. If the installer recommends further assessment or follow-up, record the reason and who will handle it. This approach gives the owner an installation file that remains useful after the technicians leave and supports a more direct conversation when another service visit becomes necessary.
Choose supply only or a complete installation
Supply only suits a buyer who already has an installer and a checked equipment list. A complete installation quotation also covers the agreed labour, materials, connections and testing. Decide which arrangement you need before comparing totals. If the old pump has failed, factor in diagnosis and lifting. If the source is unequipped, remember that a pump price alone leaves out much of the cost of getting water to the tank.
An installed option can bring those responsibilities into one agreed scope, but the proposal still needs clear boundaries. Ask whether transport, civil works, electrical supply interfaces, additional materials and operator handover are included. Where you are comparing the two routes, use the same equipment and duty basis. We can help make the differences visible so you can choose the procurement arrangement that fits the project. The decision should be based on who is responsible for the whole outcome and how it will be checked, alongside the individual product prices.
Questions about test pumping and pump sizing
How much should I budget for this service?
As an initial guide, allow KSh 10,000–30,000 for an allowance for a site assessment, review of available test records and pump-selection calculations. A second allowance is KSh 50,000–150,000+ for a separately arranged field pumping test, depending on duration, test equipment, discharge arrangements and reporting. These are planning figures, not a fixed quotation. Confirm VAT, travel, materials and all included work for your site.
What do I need to send for a quotation?
Send your county, nearest town, location pin, daily water requirement and available borehole or equipment records. For an existing system, include clear pump, motor and controller labels and a description of the fault or work required. Tell us what information is missing.
Can you supply the products and install them?
You can request equipment supply only or a quotation including the agreed installation work. The quotation lists the exact models, quantities, labour and testing so you can see what the total covers. We check compatibility before selecting equipment.
Can I get an estimate before a site visit?
Yes. The range at the top of this page is a starting budget. Share the available records and photos for an initial review. If your project needs measurements or diagnosis, agree the assessment charge and the next step before booking.
Do you handle projects outside Nairobi?
Send your enquiry from any of Kenya’s 47 counties. Our contact base is Kamulu, Nairobi. We confirm travel, delivery and the practical installation or service arrangements for your location before booking.
What about stock, warranty and payment?
Confirm the selected equipment, availability, delivery time, written warranty terms and payment stages in your quotation. Keep the invoice, model and serial numbers and handover record together for later support.
Manufacturer and official resources
Use these resources for current requirements and equipment guidance. The documentation for the exact supplied model and a site-specific assessment remain the basis for the work.
- Franklin Electric — application, installation and maintenance resources
- Grundfos — pump selection and sizing principles
- Water Resources Authority — water-use allocation and permitting
- EPRA — renewable-energy licensing guidance
Our sister companies
For related work outside the agreed pumping scope, contact Borehole Drillers Kenya or Hamiki Engineering. Confirm their scope and quotation separately.
Get a quotation for your borehole
Send your location pin, water requirement and available equipment or borehole records. Tell us whether you need supply only, installation, repair or conversion, and we will help identify the next step for your quotation. Call +254 743 731151 or email support@boreholepumpinstallation.com.
Review installation price factors · Find your county · Compare all services
